The recast Energy Performance of Buildings Directive (EU 2024/1275) reshapes European heating choices: fossil-boiler subsidies ended in January 2025, all new buildings must be zero-emission from 2030 (public buildings from 2028), and its Article 10 requires solar installations — photovoltaic, solar thermal or PVT — on new non-residential buildings over 250 m² from the end of 2026 and on all new homes by the end of 2029.
What is the EPBD and where does it stand in 2026?
The recast Energy Performance of Buildings Directive — Directive (EU) 2024/1275 — is the EU's master plan for decarbonising its building stock, in force since 28 May 2024. Member States had until 29 May 2026 to transpose it into national law, and on 15 July 2026 the European Commission opened infringement procedures against all 27 Member States for incomplete transposition — a measure of how demanding the directive is, not a sign of retreat from it. One provision ran ahead of the rest: the ban on subsidising standalone fossil fuel boilers, applicable since 1 January 2025.
For anyone choosing a heating system, the EPBD matters because it works on three fronts at once. It removes public money from fossil boilers today, it defines what may heat new buildings from 2028–2030, and it mandates solar energy installations — explicitly including solar thermal and PVT — on a widening set of roofs from the end of 2026.
Can fossil fuel boilers still be subsidised — or installed?
Since 1 January 2025, Member States may no longer provide financial incentives for installing standalone fossil fuel boilers. The operative word is standalone: Commission guidance from October 2024 confirms that hybrid systems — a boiler paired with a solar thermal installation or a heat pump — may still receive support. That carve-out makes a solar retrofit one of the few subsidisable upgrades left for a building that keeps its gas boiler for now, and it is reshaping how installers package renovation offers.
Installation itself remains legal for the time being, subject to national rules that increasingly diverge. The directive requires Member States to set trajectories in their National Building Renovation Plans for phasing out fossil fuel boilers entirely by 2040, and new-build rules bite much earlier through the zero-emission standard described below. The practical read for a boiler at end-of-life in 2026: replacing it with another gas boiler means buying into a technology with a published end date, no subsidies, and a carbon price arriving on its fuel — see the ETS2 guide.
What is a zero-emission building — and how do you heat one?
A zero-emission building, the EPBD's new-build standard, causes zero on-site carbon emissions from fossil fuels. The standard applies to new publicly owned buildings from 1 January 2028 and to all new buildings from 1 January 2030. A gas combi boiler simply cannot be specified in those projects; heating shifts to heat pumps, solar thermal, efficient district heat, or combinations of them.
In practice the specification conversation converges on an electric-plus-solar package: a heat pump whose seasonal efficiency (ηs) comfortably clears the legal floors, combined with solar thermal or PVT covering domestic hot water. Hot water is the load that persists year-round in efficient new buildings, which is exactly the load solar covers best — and why the heat pump + solar DHW combination is becoming the default zero-emission spec in residential and hotel projects alike.
PVT deserves particular attention in zero-emission design because it answers two EPBD articles with one roof: the panels satisfy the solar mandate below while simultaneously producing electricity and heat — or serving as the heat pump's source — from the same area. On tight urban roofs, where the mandate and the heating strategy compete for square metres, that dual function is frequently what makes the numbers close.
Does the EPBD solar mandate include solar thermal and PVT?
Yes. Article 10 requires \"suitable solar energy installations\" to be deployed, and the wording covers photovoltaics, solar thermal collectors and hybrid PVT panels alike — the directive mandates the deployment, the specifier chooses the technology. All new buildings must additionally be designed solar-ready, so that installations can be added later without structural work.
The rollout follows a fixed calendar:
| Deadline | Buildings covered by the Article 10 solar mandate |
|---|---|
| 31 Dec 2026 | New public and non-residential buildings >250 m² |
| 31 Dec 2027 | Existing non-residential buildings >500 m² at major renovation; existing public buildings >2,000 m² |
| 31 Dec 2028 | Existing public buildings >750 m² |
| 31 Dec 2029 | All new residential buildings; new roofed carparks |
| 31 Dec 2030 | Existing public buildings >250 m² |
The area sub-thresholds follow the Commission's published summaries; the final transposed details should be checked on EUR-Lex and in national law, since Member States implement them. The strategic point stands regardless: Article 10 is a guaranteed rooftop demand pipeline across all 27 states, and heat-led buildings — hotels, care homes, sports facilities, multi-family housing — are precisely where solar thermal or PVT delivers more usable energy per square metre than PV alone.
What do the renovation rules mean for existing buildings?
The EPBD sets minimum energy performance standards that reach existing stock in waves: the worst-performing 16% of non-residential buildings must be renovated by 2030 and 26% by 2033, while average residential primary energy use must fall 16% by 2030 and 20–22% by 2035 — with the majority of savings coming from the worst buildings. Owners of the lowest-class properties should expect national regulation to reach them first.
Heating is usually the largest single lever in those renovations. A heating system swap plus solar DHW frequently delivers more measured primary-energy improvement per euro than envelope works alone, which is why renovation packages increasingly lead with the plant room. For buildings that must keep a boiler temporarily, the hybrid route — boiler plus solar thermal — remains both legal and subsidisable, and hybrid solar and heat pump systems cover the full transition path.
For non-residential owners the timing question is concrete: a building in the worst 16% of national stock has a regulatory renovation date before 2030, and major renovation is also the trigger that pulls existing non-residential buildings over 500 m² into the solar mandate. Bundling the heating replacement, the solar installation and the envelope work into one project — rather than meeting each trigger separately — is almost always the cheaper compliance path.
What should installers and building owners do now?
Installers should treat solar competence as core business: the Article 10 deadlines begin arriving in December 2026, and every one of them creates specification demand for certified collectors and PVT panels — subsidy schemes and public tenders across Europe already require Solar Keymark certification as an entry ticket. Heat pump and hybrid design skills gain value for the same reason: the subsidy carve-out and the zero-emission standard both point the same way, and the market is moving — European heat pump sales grew 13% in 2025 to 2.88 million units (EHPA).
Building owners should check their national transposition status before committing — the July 2026 infringement wave means some national rules will land late, but they will land. For new projects, design solar-ready and zero-emission now rather than retrofitting compliance later; for existing buildings, time heating replacement to renovation triggers rather than waiting for a breakdown winter. Solimpeks, manufacturing collectors, PVT panels, heat pumps and storage tanks in Konya since 2001, supplies exactly the technology set the EPBD steers toward — one reason the directive is required reading for its distributor network.
Frequently asked questions
Does the EPBD ban gas boilers?
Not immediately. It banned subsidies for standalone fossil boilers from January 2025, makes fossil heating impossible in new public buildings from 2028 and all new buildings from 2030, and requires national trajectories to phase fossil boilers out by 2040. Existing boilers may keep operating.
Does the EPBD rooftop mandate require photovoltaics specifically?
No. Article 10 requires suitable solar energy installations, and solar thermal collectors and PVT hybrid panels qualify alongside PV. Specifiers can choose the technology that matches the building's loads — thermal for heat-led buildings, PV for electricity-led, PVT for both.
Can I still get a subsidy for a gas boiler combined with solar?
Yes. Commission guidance from October 2024 confirms hybrid systems — a boiler paired with solar thermal or a heat pump — may still receive public support, because the subsidy ban targets standalone fossil boilers only. National scheme rules define the exact conditions.
When do the EPBD rules apply in my country?
The transposition deadline was 29 May 2026, and in July 2026 the Commission opened infringement procedures against all 27 Member States for incomplete transposition. Practical dates therefore vary by country — check your national implementation, but plan against the EU calendar since the deadlines themselves do not move.
What does solar-ready mean for a new building?
The building must be designed so a solar installation can be added later without major structural work: adequate roof load-bearing capacity, routing for pipes or cables, and space for equipment such as a storage tank. The EPBD requires it for all new buildings.